Valve Mounting Bolting and Imperial Stud Kit (#10-24)
The Enerpac BKD71 imperial stud kit (#10-24) includes 4 studs and 4 stud nuts. It is used stud bolt kits to ensure the correct bolt length. The studs are easily cut to length and stud nuts make installation easier. The mounting stud must project into the manifold a minimum of .375" (9,5 mm). After installation, torque the stud nuts to 45 in-lbs (5 Nm). To calculate the required stud length, add the stud length for the directional valve and each accessory module used in the valve stack. Add .78" (19,81 mm) to this length. The mounting studs should be cut to this total length.