NO. |
NAME |
FUNCTION |
1. |
AC Power switch |
Turns On (I) or Off (O) the tester. |
2. |
Fuse |
Use only 1A 250V replacement fuse slow blow. |
3. |
Leakage Limit Adjustment knob |
Used to adjust the trip level for the excessive leakage current test. |
4. |
Timer switch |
When switch is in Defeat, the test duration will be the time the test switch is pressed +1 second. In the On position the test time will depend on the time adjust potentiometer 1-60 seconds. |
5. |
Test Time Adjust knob |
Adjust the test time from 1 – 60 seconds. |
6. |
RESET Button / Red Indicator |
When lit, indicates that the HT-3000P-1A-AC is unarmed. This button must be pushed before the test button is functional. When the reset button is pressed, the red reset indicator goes out and the yellow test indicator is lit. PRESSING THE RESET BUTTON AT ANY TIME STOPS THE TEST. |
7. |
TEST Button / Blue Indicator |
When lit, indicates that the HT-3000P-1A-AC is ready to test the connected equipment. The blue test indicator goes out when the test button is pressed. |
8. |
Voltage Meter |
Provides visual indication to the operator of the actual output voltage. |
9. |
Hipot Pass LED |
At the end of the test, if no Excess leakage was detected, the green hipot pass led will light and the test will terminate. |
10. |
Full Voltage LED |
Full voltage led indicates the test has started, the voltage is at the output and the duration timer starts. |
11. |
Excess Leakage LED |
Indicates failure of leakage current test. If leakage current between the primary circuit and ground is higher than the preset value, the red excess leakage led will light, the internal buzzer will sound, and the test will be terminated. |
12. |
Hipot Fail LED |
Indicates a failure when a high intensity ARC is detected. |
13. |
Current Meter |
Provides visual indication to the operator of the actual output current. |
14. |
HV Output |
Voltage will be present during test. The Red 18 AWG Test Lead provided will be connected. |
15. |
Return Lead Receptacle |
Grounded banana plug receptacle. The Green 10 AWG Test Return Lead provided will be connected |
16. |
Voltage adjust knob |
The test can only start if the knob is at the minimum. Once the test is running increase the voltage by turning the knob |